Xero lock date: when Deep Space holds back a bill

If a supplier invoice or a subcontractor payment schedule would land in a period your accountant has locked in Xero, Deep Space does not send it. It tells you why and lets someone with the right permission move the posting date into an open period and push again, all from the same screen.

For accounts payable, commercial managers and finance. Applies to supplier invoices (Invoice Register) and subcontractor payment schedules. Head contract invoices are not checked.

1The 60-second version

Xero lets anyone create a draft bill dated inside a locked period, but only an Adviser can approve it. Without a check, Deep Space would say “In Xero” and your finance team would only find the problem when the bill refused to approve. Re-dating it in Xero would then leave Deep Space and Xero disagreeing about the date.

Three rules that explain everything
  • The bill date is the Posting date. Deep Space sends a record's Posting date to Xero as the bill date. The invoice date printed on the supplier's document never changes.
  • On or before the lock date means no push. Right before creating the bill, Deep Space reads the lock date from Xero. If the Posting date is on or before it, nothing is sent and the record shows Xero locked.
  • The fix is a new Posting date, with a reason. Someone with the Move commercial period permission (or a workspace manager) picks a date after the lock, types a reason and clicks Push to Xero. The change is logged on the record's history.

The approval of the invoice or schedule is not undone. It stays approved and only the push is held back until the date is fixed.

2How the lock date check works

1 · Push startsAfter approval (automatic) or when someone clicks Push to Xero.
2 · Read XeroDeep Space reads the organisation's lock dates from Xero.
3a · LockedPosting date on or before the lock: nothing sent, record marked Xero locked.
3b · OpenPosting date after the lock: the bill is created in Xero as usual.

Which lock date counts

Xero has two lock dates under Settings → Advanced → Financial settings: the one that stops all users except Advisers, and the end-of-year one that stops everyone. Deep Space uses the later of the two, because a bill dated before either one cannot be approved by your normal accounts team.

When the check runs

If Xero cannot be read

When Deep Space cannot read the lock date (Xero down, connection problem), it does not hold up your work: the push goes ahead as it always did, and the failed read is written to the Finance Integrations activity log so an admin can see it happened.

3Who can move the posting date

Changing a Posting date moves the cost into a different month, so it is limited to people who are trusted to move commercial periods:

  1. Deep SpaceGive a role the permission
    Go to Admin → Security, open the role (for example your accounts or commercial manager role), find Commercial → Move commercial period, tick it and save. Everyone with that role can now fix a blocked push.

Everyone else still sees the banner and the reason, with a line telling them to ask someone with that permission (see section 4).

4What a blocked supplier invoice looks like

Open the invoice from the Invoice Register. A red banner sits at the top of the drawer, under the buttons:

Supplier invoice drawer with the red Xero lock banner, a Posting date field, a Reason field and a Push to Xero button
Supplier invoice blocked by the Xero lock date, as seen by someone allowed to fix it. The banner says Xero is locked to 30 Jun 2019 and nothing was sent; the Posting date field is already set to 1 Jul 2019, the first open day, with a Reason box and a Push to Xero button next to it.

If you do not have the Move commercial period permission, the banner shows the same message without the date and reason fields, and asks you to get someone who has it:

Supplier invoice drawer with the Xero lock banner and a line asking for someone with the Move commercial period permission
The same banner for a user without the Move commercial period permission. It explains the lock and the refused Posting date, then says: ask someone with the “Move commercial period” permission to change the posting date, then push again.
What does not change

The invoice keeps its approval status (for example Authorised). No approval is reset, and the supplier's invoice date is untouched.

5Moving the posting date and pushing again

  1. Deep SpaceCheck the suggested date
    The banner's Posting date field already holds the first day after the Xero lock that also falls in an open Deep Space commercial period. Keep it or pick a later date. A date that is still on or before the lock is refused with “Choose a date after …”.
  2. Deep SpaceType the reason
    The Reason box is required, for example “June locked in Xero, posting into July”. It is saved with your name and the old and new dates.
  3. Deep SpaceClick Push to Xero
    Click Push to Xero in the banner. Deep Space saves the new Posting date and pushes straight away; there is no second button to press.
  4. XeroThe bill arrives dated on the new Posting date
    The banner disappears, the invoice moves to In Xero, and the bill in Xero carries the new date. The cost period in Deep Space follows the new Posting date.
Draft bill in Xero dated 1 Jul 2019 with the supplier invoice PDF attached
The bill in Xero after the fix. The draft bill is dated 1 Jul 2019, the new Posting date, while the attached supplier invoice still shows its original invoice date of 15 Jun 2019.

You can also change the Posting date before pushing, from the Posting date box in the invoice details (the Change link), then use the normal Push to Xero button at the top of the drawer.

6Finding every blocked invoice in the register

In the Invoice Register, the last tab is Blocked: Xero period locked. It lists only invoices whose push was refused by the lock date, with a count next to the tab name. In the Xero column those rows show the red Xero locked badge; hover it to see the full message.

Invoice Register with the Blocked: Xero period locked tab selected, one invoice listed with a Xero locked badge
Invoice Register, Blocked: Xero period locked tab. One invoice is listed with status Authorised, Posting date 15/06/2019 and the red Xero locked badge in the Xero column.

An invoice leaves this tab as soon as a push gets past the lock check: when it reaches Xero, or when it is pushed with a date after the lock but fails for a different reason (that new reason is shown instead). Sending it back through Revise and Resubmit or a new approval also clears it.

7What the Timeline records

Click Timeline at the top of the invoice drawer to see the record's history. A blocked push adds an entry with a red lock: “Not pushed to Xero: Xero is locked to …”, with the person who pushed and the time. Every Posting date change adds an entry showing the old date, the new date, who changed it and the reason.

Invoice Timeline showing a red lock entry Not pushed to Xero above two Posting date changed entries
Timeline after a blocked push. The newest entry, with a red lock, reads “Not pushed to Xero: Xero is locked to 30 Jun 2019. Set the posting date to 1 Jul 2019 or later, then push again.” Below it are Posting date changed entries with the old and new dates and the reason.
Invoice Timeline after the fix: Posting date changed from 15/06/2019 to 01/07/2019, then Pushed to Xero
Timeline after the fix. “Posting date changed from 15/06/2019 to 01/07/2019” with the reason, followed by “Pushed to Xero”; the details panel shows the Posting date 01/07/2019 and the cost period that follows it.

8Blocked subcontractor payment schedules

Payment schedules follow the same rule when an accepted schedule is pushed to Xero as a bill, whether on Accept & Push to Xero or with the Push to Xero button later.

Payment schedule drawer with Accepted and Xero locked chips and the red lock banner
Payment schedule blocked by the Xero lock date. The header shows Accepted and a red Xero locked chip; the banner says Xero is locked to 30 Jun 2008 and nothing was sent, with Posting date, Reason and Push to Xero.
Payment schedule drawer after the fix, showing In Xero and Posting date 01/07/2008
The same payment schedule after the fix. The chip now reads In Xero; the Posting date box shows 01/07/2008, who changed it and why, and the date is read-only because the bill is in Xero.
Head contract invoices

Invoices you send to your client (head contract) are not checked against the Xero lock date.

9Common questions

Why did Deep Space suggest a date later than the day after the lock?
The suggestion is the first day after the Xero lock that is also in an open Deep Space commercial period. If that month is closed in Deep Space, the suggestion moves to the first day of the next open month.
Does moving the Posting date change the supplier's invoice date or due date?
No. The invoice date and due date stay as printed on the supplier's document. Only the date the bill is posted on, and the cost period that follows it, change.
I changed the date and pushed, but it failed for another reason. Is it still locked?
No. Once a push gets past the lock check, the lock banner and the Blocked tab entry are cleared. The error you see is the new reason (for example a currency or contact problem in Xero). Fix that and push again.
Can my accountant just approve the draft in Xero instead?
Not any more: Deep Space no longer sends the bill at all while the Posting date is locked, so there is no draft to approve. That keeps the date in Deep Space and Xero the same.
Who unlocks a period in Xero?
Your Xero Adviser, under Settings → Advanced → Financial settings. If they move the lock date back, the next push goes through with the original Posting date and nothing needs changing in Deep Space.
The banner says nothing was sent. Do I need to re-approve?
No. The approval stands. Fix the Posting date and push.