Xero lock date: when Deep Space holds back a bill
If a supplier invoice or a subcontractor payment schedule would land in a period your accountant has locked in Xero, Deep Space does not send it. It tells you why and lets someone with the right permission move the posting date into an open period and push again, all from the same screen.
1The 60-second version
Xero lets anyone create a draft bill dated inside a locked period, but only an Adviser can approve it. Without a check, Deep Space would say “In Xero” and your finance team would only find the problem when the bill refused to approve. Re-dating it in Xero would then leave Deep Space and Xero disagreeing about the date.
- The bill date is the Posting date. Deep Space sends a record's Posting date to Xero as the bill date. The invoice date printed on the supplier's document never changes.
- On or before the lock date means no push. Right before creating the bill, Deep Space reads the lock date from Xero. If the Posting date is on or before it, nothing is sent and the record shows Xero locked.
- The fix is a new Posting date, with a reason. Someone with the Move commercial period permission (or a workspace manager) picks a date after the lock, types a reason and clicks Push to Xero. The change is logged on the record's history.
The approval of the invoice or schedule is not undone. It stays approved and only the push is held back until the date is fixed.
2How the lock date check works
Which lock date counts
Xero has two lock dates under Settings → Advanced → Financial settings: the one that stops all users except Advisers, and the end-of-year one that stops everyone. Deep Space uses the later of the two, because a bill dated before either one cannot be approved by your normal accounts team.
When the check runs
- Only when Deep Space is about to create a new bill in Xero. If the supplier's bill already exists in Xero and Deep Space links to it instead, nothing new is posted and there is no check.
- On every push: the automatic push after approval, a manual Push to Xero, and a push from the lock banner itself.
- If Xero has no lock date, the push goes ahead as before.
When Deep Space cannot read the lock date (Xero down, connection problem), it does not hold up your work: the push goes ahead as it always did, and the failed read is written to the Finance Integrations activity log so an admin can see it happened.
3Who can move the posting date
Changing a Posting date moves the cost into a different month, so it is limited to people who are trusted to move commercial periods:
- anyone whose role has the Commercial → Move commercial period permission, or
- a workspace manager.
-
Deep SpaceGive a role the permissionGo to Admin → Security, open the role (for example your accounts or commercial manager role), find Commercial → Move commercial period, tick it and save. Everyone with that role can now fix a blocked push.
Everyone else still sees the banner and the reason, with a line telling them to ask someone with that permission (see section 4).
4What a blocked supplier invoice looks like
Open the invoice from the Invoice Register. A red banner sits at the top of the drawer, under the buttons:
- the first line names the lock and the first date you can use, for example “Xero is locked to 30 Jun 2019. Set the posting date to 1 Jul 2019 or later, then push again.”
- the second line confirms nothing was sent to Xero and shows the Posting date that was refused.
If you do not have the Move commercial period permission, the banner shows the same message without the date and reason fields, and asks you to get someone who has it:
The invoice keeps its approval status (for example Authorised). No approval is reset, and the supplier's invoice date is untouched.
5Moving the posting date and pushing again
-
Deep SpaceCheck the suggested dateThe banner's Posting date field already holds the first day after the Xero lock that also falls in an open Deep Space commercial period. Keep it or pick a later date. A date that is still on or before the lock is refused with “Choose a date after …”.
-
Deep SpaceType the reasonThe Reason box is required, for example “June locked in Xero, posting into July”. It is saved with your name and the old and new dates.
-
Deep SpaceClick Push to XeroClick Push to Xero in the banner. Deep Space saves the new Posting date and pushes straight away; there is no second button to press.
-
XeroThe bill arrives dated on the new Posting dateThe banner disappears, the invoice moves to In Xero, and the bill in Xero carries the new date. The cost period in Deep Space follows the new Posting date.
You can also change the Posting date before pushing, from the Posting date box in the invoice details (the Change link), then use the normal Push to Xero button at the top of the drawer.
6Finding every blocked invoice in the register
In the Invoice Register, the last tab is Blocked: Xero period locked. It lists only invoices whose push was refused by the lock date, with a count next to the tab name. In the Xero column those rows show the red Xero locked badge; hover it to see the full message.
An invoice leaves this tab as soon as a push gets past the lock check: when it reaches Xero, or when it is pushed with a date after the lock but fails for a different reason (that new reason is shown instead). Sending it back through Revise and Resubmit or a new approval also clears it.
7What the Timeline records
Click Timeline at the top of the invoice drawer to see the record's history. A blocked push adds an entry with a red lock: “Not pushed to Xero: Xero is locked to …”, with the person who pushed and the time. Every Posting date change adds an entry showing the old date, the new date, who changed it and the reason.
8Blocked subcontractor payment schedules
Payment schedules follow the same rule when an accepted schedule is pushed to Xero as a bill, whether on Accept & Push to Xero or with the Push to Xero button later.
- Open the schedule from Commercial → Subcontractors → Payment Schedules (Issued). The header shows a red Xero locked chip next to the status, and the same red banner sits under it.
- The schedule stays Accepted; only the push is held back.
- Fix it the same way: Posting date, reason, Push to Xero in the banner.
- The schedule's Activity tab records the failed push and the Posting date change.
Invoices you send to your client (head contract) are not checked against the Xero lock date.