Approval Workflows in Deep Space: Every Workflow, Examples and DoA Worksheets

Every record type Deep Space can send for internal approval, what each approval controls, example set-ups for businesses of different sizes, and worksheets to agree your own Delegation of Authority (DoA) before it is configured. Fill the worksheets in on this page, print them or save them as PDF, and send them to our support team if you would like us to set it up for you.

For finance and commercial leads For admins setting up DoA Updated November 2026
This is the planning guide

It tells you what can be approved and helps you decide how you want it approved. For how DoA behaves and where every setting is, see Delegation of Authority in Deep Space. Stuck at any point? Email help@deepspacegroup.ai and our support team will help, or set it up for you.

1How to use this guide

Delegation of Authority (DoA) is how Deep Space decides who has to approve a record before it moves on, and in what order. You set it up once for your company, by record type, and it applies across every project. This guide walks through every record type that can be approved, shows how other businesses typically set each one up, and gives you a worksheet for each so you can agree your own rules before anything is configured.

  1. Read the list
    Section 2 lists every approval workflow on one page. You do not have to use them all: most businesses start with purchase orders, subcontracts, variations and payment schedules, and add the rest later.
  2. Agree your roles and limits first
    Fill in Worksheet A (company and settings) and Worksheet B (who can approve up to what value). Most workflows lean on those limits, so they are the part worth getting right.
  3. Go workflow by workflow
    Each workflow section says what the approval controls, when it starts, which amount it uses and what happens on approval or rejection, then shows example set-ups. Fill in its Your set-up box (Worksheet C) as you go. Leave a box blank or tick Decide later if you are not sure.
  4. Agree it and hand it over
    Sign off Worksheet D. Then set it up yourself using Setting up DoA for your company, or send the worksheets to help@deepspacegroup.ai and our support team will configure it for you and run a test with you (section 22).
Filling in the worksheets on this page

Click any shaded box and type, or click a tick box. Your answers are saved in this browser on this device, so you can close the page and come back. Nothing you type is sent to Deep Space. To share them, print the worksheets or save them as PDF, or download your answers as a CSV file that opens in Excel. Prefer paper? Print the worksheets and fill them in by hand.

2Every approval workflow at a glance

These are all the record types Deep Space can send for internal approval. The first sixteen appear in the Entity type list on Admin › Finance › Delegation of Authority, and each one has its own workflow. Submittal sign-off is the one exception: it uses the approval engine but has no entry in that list yet (see section 19).

Workflow (as named in Deep Space)Where it startsWhat approval controlsAmount that drives DoAWith no workflowAuto-approve can apply
Procurement and accounts payable
POPO Register: Send to Approval / Submit for ApprovalLets the PO be issued to the supplierPO total, ex GST (Price TBC = $0)Goes to the project's PMYes
PO InvoiceInvoice Register: Send for AuthorisationAuthorises payment, creates the cost claim and sends the bill to XeroTicked lines, ex GST (printed total if lines couldn't be read)Goes to the project's PMYes
Subcontract AgreementSubcontract Register › Agreement tab: Submit for Internal ApprovalLets the subcontract be issued for signingContract value, ex GSTGoes to the project's PMYes
Tender RecommendationBid package › Recommendation tab: Submit for approvalUnlocks awarding the packageRecommended award value (enter ex GST)Goes to the project's PMYes
Client side (head contract)
Head Contract (Client)Head Contract Register › Agreement tab: Submit for Internal ApprovalRecords internal sign-off before the contract is issued or executedCurrent contract sum, ex GSTIf submitted: goes to the project's PMYes
HC Variation (Client)Variations register: Submit Variation (or Submit for Internal Approval)Lets the variation be submitted and sent to the clientSell value to the client, ex GST (credits route to the lowest limit)Goes to the project's PMYes
HC Progress ClaimProgress Claims to Client: Submit for Internal ApprovalUnlocks Serve Payment ClaimGross claimed this period (+ retention claimed back), ex GSTGoes to the project's PMYes
Client Payment ScheduleClient Payment Schedules: Submit for ApprovalUnlocks Accept on the client's scheduleAmount the client scheduled (+ retention release), ex GSTGoes to the project's PMYes
PS DrawdownProvisional Sum Register: Approve on a drawdownApproves the drawdown against the allowance; over-runs become a variationDrawdown sell value, ex GSTNo approval: Approve works in one clickNo
Subcontract side
Subcontract VariationSubcontract Variations: Submit for Internal ApprovalLets the variation go to the subcontractor and onto the subcontractNet variation value, ex GST (credits route to the lowest limit)Goes to the project's PMYes
Subcontract Payment SchedulePayment Schedules (Issued): Submit for Approval, after a subcontractor's claimAccepts the schedule, certifies the claim and sends the bill to XeroCertified total plus retention released, ex GSTNo approval needed: Accept directlyYes
Compliance and HSEQ
Company General InductionAutomatic, when a subcontractor company submits its general inductionAccepts or rejects the company's inductionNone (role only)Goes to workspace adminsNo
SWMSHSEQ › SWMS (Request Approval), or automatic from DS Site with SWMS sign-onAccepts the SWMS; with SWMS sign-on, publishes it for sign-onNone (role only)Only if requested: goes to the project's PMNo
Site InductionHSEQ › Site Inductions (Request Approval)Accepts the worker's site inductionNone (role only)Only if requested: goes to the project's PMNo
Permits to WorkHSEQ › Permits to Work (Request Approval)Approves the permit before the work startsNone (role only)Only if requested: goes to the project's PMNo
Plant InductionsHSEQ › Plant Inductions (Request Approval)Accepts the plant onto siteNone (role only)Only if requested: goes to the project's PMNo
Notices
Submittal sign-offNotices › Submittals (Sign-off panel)Lets a signature-required submittal be closedNone (role only)Always the project's PM (no workflow possible yet)No

Amounts are ex GST, so set your limits ex GST to match. The one exception is a supplier invoice whose lines Deep Space could not read: it uses the invoice total as printed. Records with no dollar value (inductions, HSEQ records and submittals) are routed by role only, so use Fixed role steps for them.

Auto-approve can apply refers to the optional setting Auto-approve within submitter's authority (DoA guide, section 7). It is off unless you turn it on.

3How a workflow is built, and the example limits used here

Every workflow is made of the same few parts. The DoA guide, section 3 explains each in full; this is the short version you need for the worksheets.

PartWhat it means when you fill in a worksheet
StepSteps run in order, top to bottom. A record is approved when its last step is approved; a rejection at any step stops it.
Fixed roleYou name the role or roles that approve this step, either a workspace role from Admin › Security (for example Construction Manager or Accounts) or a project Team role (for example the project's Project Manager). Anyone holding one of the roles can approve.
DoA-drivenYou don't name a role. Deep Space looks at the amount and sends the step to the role with the lowest limit that still covers it on your Approval Thresholds (Worksheet B). Amounts above every limit go to Highest Authority. Large records escalate on their own.
All must approveFixed role steps only. Normally one approver closes the step. Tick Require all approvers when every role you listed must approve (for example two different directors).
Min amountFixed role steps only (a DoA-driven step has no Min amount). The step only runs when the record's amount is at least this figure, so senior sign-off can be kept for large records. If a record is below the Min amount on every step, it still goes to the first step.
Highest AuthorityOne or more roles who can approve any amount, catch amounts above every limit and rescue a step that is stuck. Always company-wide.
Project overrideA project can have its own copy of a workflow or of the limits when it genuinely needs different rules (a joint venture, or a client with its own limits). Every other project keeps the company default.

One set of limits for every record type

Limits belong to roles, not to record types. A Project Manager with a $50,000 limit has that limit on every workflow that uses a DoA-driven step: purchase orders, subcontracts, variations and claims alike. If a role should have a different limit for one record type (for example, a PM may commit $50,000 of spend but only price $20,000 of variations to the client), build that workflow from Fixed role steps with Min amounts instead of a DoA-driven step:

StyleWho approves a $300,000 recordUse it when
DoA-driven stepOne person: the role with the lowest limit that covers $300,000 (the General Manager, with the example limits below)Your Worksheet B limits suit this record type
Fixed role steps with Min amountsEveryone whose step's Min amount is $300,000 or less, in order (for example PM, then Construction Manager from $25,000, then MD from $250,000)This record type needs its own limits, or you want each level to see the larger records

Credits and omissions have negative amounts, so a DoA-driven step sends them to the role with the lowest limit. Limits are compared as plain numbers, so enter them all in the currency you trade in.

If you don't set up a workflow

Nothing is blocked, but what happens depends on the record type, and the With no workflow column in section 2 shows each one. Most go to the project's Project Manager (from the project's Team) or, if there isn't one, to your workspace admins. Subcontract payment schedules and provisional sum drawdowns don't ask for approval at all until you set up a workflow for them. If you would rather record types without a workflow were approved straight away, turn on Skip approval when unconfigured (DoA guide, section 6).

The example limits used in this guide

The examples in each section use one fictional set of roles and limits so you can compare them. They are illustrations, not recommendations: use your own policy.

RoleType of roleLimit (ex GST)Example of a record it approves
Site ManagerProject Team role$5,000A $3,200 hire order
Project ManagerProject Team role$50,000A $42,000 supply order
Construction ManagerWorkspace role$250,000A $180,000 subcontract
General ManagerWorkspace role$1,000,000A $640,000 subcontract
Managing DirectorHighest AuthorityNo limitA $2.4m subcontract

Two more workspace roles appear in the examples without a limit of their own: Accounts (accounts payable) and Commercial Manager. A role only needs a limit if it should receive DoA-driven steps or be auto-approved within its own authority.

4Worksheet A: your company and settings

One copy per business entity. Each Deep Space workspace belongs to one legal entity (one ABN or NZBN) and has its own DoA, so if your group runs more than one workspace, fill in a set of worksheets for each, or note on Worksheet A that another entity should copy this one.

The two settings are explained in the DoA guide: Skip approval when unconfigured (section 6) and Auto-approve within submitter's authority (section 7). Both are off unless you turn them on. Auto-approve relaxes segregation of duties, so decide on it deliberately.

Worksheet AYour company and settings
Skip approval when unconfiguredOnOff (default)
Auto-approve within submitter's authorityOnOff (default)

5Worksheet B: approval roles and limits

This is your DoA matrix: each role that holds spending authority and its limit. DoA-driven steps use it to route a record by value, and auto-approve uses it to decide what a submitter can clear themselves.

Worksheet BApproval roles and limits
#Role nameWorkspace role or project Team roleWho holds it todayLimit (ex GST)Notes
e.g.Project ManagerProject Team roleEach project's PM (set on the project's Team)$50,000Commits spend on their own projects
1
2
3
4
5
6
7
8
9
10
11
12

Changing a limit later is easy and recorded: you add a new limit for the role and the old one is retired automatically, with its history kept.

6Purchase orders

ProcurementRouted by valueAuto-approve can apply

A purchase order commits project money to a supplier. Approval happens before the PO is sent to the supplier.

What it controls
Whether the PO can be issued to the supplier.
Where it starts
PO Register: click Send to Approval on the new PO form, or Submit for Approval on a draft PO. The PO moves to Pending Approval.
Amount used for DoA
The PO total ex GST (including any GST-free lines). A Price TBC PO goes at $0, which routes to the lowest limit.
When it is approved
The PO is Approved and can be sent to the supplier or for e-signature.
When it is rejected
The PO moves to Needs fixing with a Review Required badge. Only the person who requested it or a workspace manager can edit it and resubmit.
With no workflow set up
It still goes for approval: to the project's Project Manager, or your workspace admins if there is none. Turn on Skip approval when unconfigured to have it approved straight away instead.
Good to know
  • Before it can be submitted, a PO needs a supplier and at least one complete line with a cost code and an amount (or Price TBC ticked).
  • Separately from DoA, your commercial settings can require the project's head contract to be executed before purchase orders and subcontracts are issued.

Example set-ups

Routed by value
Most builders: the simplest set-up
  1. 1Approve PO DoA-drivenBy value$3,200 → Site Manager · $42,000 → Project Manager · $180,000 → Construction Manager · $1.2m → MD
Commercial check, then by value
A second pair of eyes on cost codes and pricing
  1. 1Commercial check Fixed roleProject Team: Contract Admin or Quantity SurveyorAny one of them
  2. 2Authority sign-off DoA-drivenBy value
Fast lane for small orders
Busy sites with lots of small hire and consumables orders
  1. 1Approve PO DoA-drivenBy value
Plus Auto-approve within submitter's authority on, with a maximum of $2,000: a Site Manager's own $1,500 order is approved on submit; everything else routes as normal.
Director on large orders
Policies that need a director on big commitments
  1. 1Approve PO DoA-drivenBy value
  2. 2Director sign-off Fixed roleWorkspace role: Managing DirectorMin amount $500,000
Worksheet CYour set-up: Purchase ordersIn Deep Space: PO
Do you want this record type approved?Yes, set up a workflowNo / not usedDecide later
StepStep nameFixed role or DoA-drivenRole(s), and workspace or project TeamAll must approve?Min amount (Fixed role only)
1
2
3

7Supplier invoices (PO Invoice)

ProcurementRouted by valueAuto-approve can apply

Supplier invoices that arrive in the Invoice Register and are matched to a purchase order. Approval authorises them for payment. (Subcontractor claims that arrive there are approved through Subcontract Payment Schedules instead.)

What it controls
Authorising the invoice for payment.
Where it starts
Invoice Register: on an invoice at Review Completed, click Send for Authorisation, then Confirm & Send. It moves to Sent for Authorisation.
Amount used for DoA
The amount being authorised: normally the ex-GST total of the invoice lines you ticked. If Deep Space could not read the invoice's lines, it uses the invoice total as printed, which includes GST. It must be more than $0, so credit notes don't go through this workflow.
When it is approved
Deep Space creates the cost claim, marks the invoice Payment Authorised and sends the bill to Xero (In Xero). If the Xero send fails, it stays Payment Authorised for you to push by hand.
When it is rejected
It goes back to Review Completed with the reason. Correct it (for example its coding or matched PO) and Send for Authorisation again. The register's own Reject button is different: it rejects the invoice outright, and that is final. If the invoice was out for authorisation, its approval is cancelled at the same time.
With no workflow set up
It still goes for approval: to the project's Project Manager, or your workspace admins if there is none. Turn on Skip approval when unconfigured to have it approved straight away instead.
Good to know
  • Before it can be sent: the invoice must be matched to an approved PO on the project, from the same supplier, and must fit within the PO's remaining balance (counting invoices already in approval). A red supplier identity check blocks it unless an admin records a reason.
  • While it is in approval, the invoice holds its share of the PO balance, so two invoices can't both use the same money.
  • Payment can't be authorised by hand while the approval is open. It happens automatically on the final approval.

Example set-ups

Accounts check, then by value
Most builders
  1. 1Accounts check Fixed roleWorkspace role: AccountsCoding, GST and PO match
  2. 2Approve for payment DoA-drivenBy value
PM confirms receipt, finance releases
Builders who want the site to confirm delivery
  1. 1Goods or services received Fixed roleProject Team: Project Manager or Site ManagerAny one of them
  2. 2Finance release Fixed roleWorkspace role: Financial ControllerMin amount $20,000
Accounts only
Builders whose DoA approves the spend at PO stage
  1. 1Accounts check Fixed roleWorkspace role: AccountsThe PO was already approved under DoA, and the invoice can't exceed it
Price TBC orders are the exception: they were approved at $0, so their first invoice sets the price. If you use Price TBC, keep a value-based step.
Worksheet CYour set-up: Supplier invoicesIn Deep Space: PO Invoice
Do you want this record type approved?Yes, set up a workflowNo / not usedDecide later
StepStep nameFixed role or DoA-drivenRole(s), and workspace or project TeamAll must approve?Min amount (Fixed role only)
1
2
3

8Subcontract agreements

ProcurementRouted by valueAuto-approve can apply

Your internal sign-off of a subcontract before it is issued to the subcontractor for signing.

What it controls
Whether the subcontract can be issued for signing.
Where it starts
Subcontract Register: open the subcontract in Draft, go to the Agreement tab and click Submit for Internal Approval. It moves to Pending Approval.
Amount used for DoA
The contract value, ex GST. It must be more than $0.
When it is approved
The subcontract is Approved and goes on through issue and e-signature (Sent for Execution, then Executed).
When it is rejected
It goes back to Draft with the reason, so it can be fixed and resubmitted. Its value still shows as committed in the Budget Register.
With no workflow set up
It still goes for approval: to the project's Project Manager, or your workspace admins if there is none. Turn on Skip approval when unconfigured to have it approved straight away instead.
Good to know
  • Before it can be submitted, the subcontract needs a schedule of values.
  • A subcontract created by awarding a tender still needs this approval, even if the tender recommendation was approved.
  • Separately from DoA, your commercial settings can require the project's head contract to be executed before purchase orders and subcontracts are issued.

Example set-ups

Contract check, then by value
Builders with a contracts or commercial team
  1. 1Contract check Fixed roleProject Team: Contracts Manager
  2. 2Award sign-off DoA-drivenBy value
Routed by value
Smaller builders
  1. 1Award sign-off DoA-drivenBy value$180,000 → Construction Manager · $640,000 → General Manager · $2.4m → MD
Two directors above $1m
Policies that need two signatories on large subcontracts
  1. 1Award sign-off DoA-drivenBy value
  2. 2Board sign-off Fixed roleWorkspace roles: Managing Director and Finance DirectorRequire all approvers ticked; Min amount $1,000,000
Worksheet CYour set-up: Subcontract agreementsIn Deep Space: Subcontract Agreement
Do you want this record type approved?Yes, set up a workflowNo / not usedDecide later
StepStep nameFixed role or DoA-drivenRole(s), and workspace or project TeamAll must approve?Min amount (Fixed role only)
1
2
3

9Tender recommendations (awarding a trade package)

ProcurementRouted by valueAuto-approve can apply

Your recommendation of which subcontractor should win a trade package, approved before the package is awarded.

What it controls
Whether the package can be awarded.
Where it starts
On the bid package, Recommendation tab: click Generate recommendation, choose the recommended bidder and award value, then click Submit for approval.
Amount used for DoA
The recommended award value you enter. Bids are captured ex GST, so enter it ex GST. It must be more than $0.
When it is approved
Awarding is unlocked. If your workspace's award rule is on, only the recommended bidder can be awarded. Awarding creates a draft subcontract, which then needs its own Subcontract Agreement approval.
When it is rejected
The recommendation goes back to draft with the recommended bidder, value, notes and shortlist kept. Nothing on the package can be awarded, and no subcontract can be created from it, until a revised recommendation is approved.
With no workflow set up
It still goes for approval: to the project's Project Manager, or your workspace admins if there is none. Turn on Skip approval when unconfigured to have it approved straight away instead.
Good to know
  • While a recommendation is waiting for approval, the package can't be awarded.
  • The recommendation is frozen while it is in approval or approved. To change it, reset it to draft (the person who submitted it, a Highest Authority holder or a workspace manager can).

Example set-ups

Estimating review, then by value
Builders with an estimating team
  1. 1Estimating review Fixed roleProject Team: Lead Estimator
  2. 2Award approval DoA-drivenBy value
PM and commercial agree
Builders who want delivery and commercial both to agree
  1. 1Delivery agrees Fixed roleProject Team: Project Manager
  2. 2Commercial agrees Fixed roleWorkspace role: Commercial Manager
Routed by value
Smaller builders
  1. 1Award approval DoA-drivenBy value
Worksheet CYour set-up: Tender recommendationsIn Deep Space: Tender Recommendation
Do you want this record type approved?Yes, set up a workflowNo / not usedDecide later
StepStep nameFixed role or DoA-drivenRole(s), and workspace or project TeamAll must approve?Min amount (Fixed role only)
1
2
3

10Head contracts (your contract with the client)

Client side (head contract)Routed by valueAuto-approve can apply

Your internal sign-off of a head contract with your client, typically your biggest commitment, before it is issued for signing or executed.

What it controls
Your internal approval of the contract. The contract's own status (draft, issued, executed) is separate and is not changed by the approval.
Where it starts
Head Contract Register: open the contract, go to the Agreement tab and, in the Internal approval card, click Submit for Internal Approval.
Amount used for DoA
The current contract sum, ex GST.
When it is approved
The Agreement tab shows "Internally approved — ready to issue."
When it is rejected
The Agreement tab shows a red box with the reason and Resubmit for approval. The contract itself is unchanged.
With no workflow set up
Submitting for internal approval sends it to the project's Project Manager, or your workspace admins if there is none.
Good to know
  • The approval is a record of sign-off. Deep Space does not stop someone sending the contract for e-signature or uploading the executed copy before it is approved, so make "wait for internal approval" part of your contract procedure.
  • With large contract sums, a DoA-driven step will usually land on your most senior limits or on Highest Authority. That is often exactly what you want.

Example set-ups

Commercial review, then the MD
Most builders
  1. 1Contract review Fixed roleWorkspace role: Commercial Manager
  2. 2Execute Fixed roleWorkspace role: Managing Director
Two directors sign
Companies whose policy needs two signatories
  1. 1Board sign-off Fixed roleWorkspace roles: Managing Director and Finance DirectorRequire all approvers ticked: both must approve
Routed by value
Builders with many small contracts (minor works, fitout)
  1. 1Contract sign-off DoA-drivenBy valueA $180,000 minor works contract goes to the Construction Manager; a $6m contract to the MD
Worksheet CYour set-up: Head contractsIn Deep Space: Head Contract (Client)
Do you want this record type approved?Yes, set up a workflowNo / not usedDecide later
StepStep nameFixed role or DoA-drivenRole(s), and workspace or project TeamAll must approve?Min amount (Fixed role only)
1
2
3

11Head contract variations (variations to your client)

Client side (head contract)Routed by valueAuto-approve can apply

Your internal sign-off of a variation before it goes to the client: in effect, approving the price you are putting to them.

What it controls
Whether the variation can be submitted and sent to the client. The client's own approval is recorded separately, on the variation's status.
Where it starts
Variations register: open a Draft variation and click Submit Variation (or Submit for Internal Approval on its Approvals tab). The variation stays in Draft, marked In Review.
Amount used for DoA
The variation's sell value to the client (the total of its scope lines), ex GST. Credits are negative and go to the lowest limit.
When it is approved
It moves on to Submitted automatically, its new items are added to the head contract as pending, and Generate & Send Document unlocks so you can send it to the client.
When it is rejected
It stays in Draft with the reason and Resubmit for approval.
With no workflow set up
It still goes for approval, to the project's Project Manager (or your workspace admins), unless Skip approval when unconfigured is on, in which case it goes straight to Submitted.
Good to know
  • Before it can be submitted, the variation needs at least one scope line, and every line needs a valid cost code.
  • Your Worksheet B limits are about committing spend. If your authority to price work to a client is different, use Fixed role steps with Min amounts here instead of a DoA-driven step (see the third example).

Example set-ups

Routed by value
Builders whose spend limits also suit pricing
  1. 1Approve variation price DoA-drivenBy value
Commercial check, then by value
Builders with a commercial team
  1. 1Commercial check Fixed roleProject Team: Quantity Surveyor or Contracts ManagerAny one of them
  2. 2Authority sign-off DoA-drivenBy value
Pricing limits of their own
Builders with different pricing and spending authority
  1. 1PM sign-off Fixed roleProject Team: Project Manager
  2. 2Construction Manager Fixed roleWorkspace role: Construction ManagerMin amount $25,000
  3. 3Managing Director Fixed roleWorkspace role: Managing DirectorMin amount $250,000
A $40,000 variation needs the PM and the Construction Manager; a $300,000 one needs all three.
Worksheet CYour set-up: Head contract variationsIn Deep Space: HC Variation (Client)
Do you want this record type approved?Yes, set up a workflowNo / not usedDecide later
StepStep nameFixed role or DoA-drivenRole(s), and workspace or project TeamAll must approve?Min amount (Fixed role only)
1
2
3

12Progress claims to your client

Client side (head contract)Routed by valueAuto-approve can apply

Your internal sign-off of a progress claim before it is served on the client and the payment-claim clock starts.

What it controls
Whether the claim can be served on the client.
Where it starts
Progress Claims to Client: open the claim in Draft and click Submit for Internal Approval.
Amount used for DoA
The gross amount claimed this period (before retention), plus any retention you are claiming back, ex GST. It must be more than $0.
When it is approved
Serve Payment Claim and Generate & Send unlock. The claim stays in Draft until you serve it.
When it is rejected
It stays in Draft, showing "Approval Rejected" with the reason and a resubmit option.
With no workflow set up
It still goes for approval, to the project's Project Manager (or your workspace admins), unless Skip approval when unconfigured is on.
Good to know
  • Claims are time-critical. Keep the route short and make sure each approver knows the claim date, so a missing approval never delays serving the claim.

Example set-ups

Commercial Manager reviews
Most builders
  1. 1Claim review Fixed roleWorkspace role: Commercial Manager
QS check, then a director for big claims
Larger projects
  1. 1QS check Fixed roleProject Team: Quantity Surveyor
  2. 2Director release Fixed roleWorkspace role: Managing DirectorMin amount $1,000,000
PM's own claims within authority
Builders using auto-approve
  1. 1Claim sign-off DoA-drivenBy valueWith auto-approve on, a claim within the submitter's own limit is approved on submit
Worksheet CYour set-up: Head contract progress claimsIn Deep Space: HC Progress Claim
Do you want this record type approved?Yes, set up a workflowNo / not usedDecide later
StepStep nameFixed role or DoA-drivenRole(s), and workspace or project TeamAll must approve?Min amount (Fixed role only)
1
2
3

13Client payment schedules (the client's response to your claim)

Client side (head contract)Routed by valueAuto-approve can apply

When your client answers a progress claim with a payment schedule, this workflow signs off the amount they have scheduled before you accept it.

What it controls
Whether the client's schedule can be accepted. Approval does not accept it for you.
Where it starts
Client Payment Schedules: open the schedule (status Received) and click Submit for Approval. It stays Received, marked "Awaiting internal approval".
Amount used for DoA
The amount the client has scheduled (certified), plus any retention release, ex GST. A $0 schedule (fully disputed) is allowed.
When it is approved
It shows "Internally approved", and Accept unlocks. Accepting then certifies the claim and updates the head contract.
When it is rejected
It stays Received and editable, marked "Approval rejected", with a resubmit option.
With no workflow set up
It still goes for approval, to the project's Project Manager (or your workspace admins), unless Skip approval when unconfigured is on.
Good to know
  • If you disagree with the client's schedule, you can still dispute it.
  • A revised schedule from the client is a new record and needs its own approval.

Example set-ups

Commercial Manager accepts
Most builders
  1. 1Accept client's schedule Fixed roleWorkspace role: Commercial Manager
PM checks, Finance accepts
Builders where finance owns debtors
  1. 1Check against claim Fixed roleProject Team: Project Manager
  2. 2Finance acceptance Fixed roleWorkspace role: Financial Controller
Worksheet CYour set-up: Client payment schedulesIn Deep Space: Client Payment Schedule
Do you want this record type approved?Yes, set up a workflowNo / not usedDecide later
StepStep nameFixed role or DoA-drivenRole(s), and workspace or project TeamAll must approve?Min amount (Fixed role only)
1
2

14Provisional sum drawdowns

Client side (head contract)Routed by value

A drawdown spends part of a provisional sum allowance in your head contract. Approving it confirms the amount that comes off the allowance, and any over-run becomes a variation to your client.

What it controls
Approving the drawdown itself: the final approval is the drawdown approval.
Where it starts
Provisional Sum Register › Drawdowns: click Approve on the drawdown. Deep Space answers "Internal approval required"; confirm with Submit for approval. The drawdown shows "In approval", and approvers see Review & approve. See Provisional Sums in Deep Space, section 6.
Amount used for DoA
The drawdown's sell value (with your margin), ex GST.
When it is approved
The drawdown is approved: the amount is claimed against the allowance, and if it runs over the allowance a provisional sum variation to your client is raised or updated.
When it is rejected
It goes back to Draft with the reason and a Resubmit button. You can edit it or delete it.
With no workflow set up
No approval is needed: Approve approves the drawdown straight away.
Good to know
  • Before it can be submitted, the allowance must be attached and every line needs a valid cost code.
  • If your client disputes the variation a drawdown raised, the drawdown goes back to Pending and needs a new approval before it can be approved again.
  • Auto-approve never applies to drawdowns.

Example set-ups

Routed by value
Most builders
  1. 1Approve drawdown DoA-drivenBy value
Commercial check first
Builders whose commercial team manages client allowances
  1. 1Commercial check Fixed roleWorkspace role: Commercial Manager
  2. 2Approve drawdown DoA-drivenBy value
Worksheet CYour set-up: Provisional sum drawdownsIn Deep Space: PS Drawdown
Do you want this record type approved?Yes, set up a workflowNo / not usedDecide later
StepStep nameFixed role or DoA-drivenRole(s), and workspace or project TeamAll must approve?Min amount (Fixed role only)
1
2

15Subcontract variations

Subcontract sideRouted by valueAuto-approve can apply

Your internal sign-off of a variation to a subcontract before it is put to the subcontractor and added to the subcontract.

What it controls
Whether a variation you raise on a subcontract can go ahead. The subcontractor's own agreement is recorded separately, on the variation's status.
Where it starts
Subcontract Variations register: open a variation in Draft and click Submit for Internal Approval. Sending the variation to the subcontractor stays locked until it is approved.
Amount used for DoA
The variation's net value (the total of its scope lines), ex GST. Omissions and credits are negative and go to the lowest limit.
When it is approved
It moves on automatically to Pending Approval (waiting on the subcontractor), and its scope lines are added to the subcontract as pending.
When it is rejected
It stays in Draft with the approver's reason. Anyone who can edit it can fix it and click Resubmit for approval.
With no workflow set up
It still goes for approval: to the project's Project Manager, or your workspace admins if there is none. Turn on Skip approval when unconfigured to have it approved straight away instead.
Good to know
  • Variations created from a subcontractor's claim are already agreed and don't go through this workflow.
  • Because omissions are negative, they always go to the lowest limit, and with auto-approve on they are within everyone's own limit. If credits need senior review, add a Fixed role step with no Min amount.

Example set-ups

Routed by value
Most builders
  1. 1Authority sign-off DoA-drivenBy value: Site Manager → Project Manager → Construction Manager → General Manager → MD
PM review, then a senior check on large ones
Builders whose PMs own their subcontract budgets
  1. 1PM review Fixed roleProject Team: Project Manager
  2. 2Senior review Fixed roleWorkspace role: Construction ManagerMin amount $50,000: variations under $50,000 stop at the PM
Commercial check on everything
Builders with a dedicated commercial team
  1. 1Commercial check Fixed roleProject Team: Quantity Surveyor or Contract AdminAny one of them
  2. 2Authority sign-off DoA-drivenBy value
Worksheet CYour set-up: Subcontract variationsIn Deep Space: Subcontract Variation
Do you want this record type approved?Yes, set up a workflowNo / not usedDecide later
StepStep nameFixed role or DoA-drivenRole(s), and workspace or project TeamAll must approve?Min amount (Fixed role only)
1
2
3

16Subcontract payment schedules (paying subcontractor claims)

Subcontract sideRouted by valueAuto-approve can apply

When a subcontractor's progress claim arrives, Deep Space creates a draft payment schedule for it. You decide each line (approve, part-approve or reject), and this workflow signs off the amount you are about to accept. It is how subcontractor claims get approved for payment.

What it controls
Accepting the scheduled amount. The final approval is the acceptance: nobody has to click Accept afterwards.
Where it starts
Payment Schedules (Issued): once every line is decided, click Submit for Approval. The schedule shows "Awaiting internal approval" and is read-only until the approval finishes.
Amount used for DoA
The total you are certifying across the lines, plus any retention you are releasing, ex GST and before retention is held back.
When it is approved
Deep Space accepts the schedule: the claim becomes Certified, the subcontract's claimed-to-date and retention are updated, the bill is sent to Xero (as a draft or authorised bill, depending on your Xero settings) and the schedule PDF is emailed to the subcontract's recipients. This takes a minute or two after the final click.
When it is rejected
It moves to Revise and Resubmit: change the line decisions and submit it again.
With no workflow set up
No approval is needed: you can Accept the schedule directly. Submit for Approval is still offered, and goes to the project's Project Manager.
Good to know
  • The person who submits a schedule cannot approve it. This is the only record type with that rule. A step marked Submitter can act on this step is exempt, for a hand-off such as "CA to send" (see the second example); the other exceptions are in the DoA guide, section 12.
  • Before it can be submitted: every line must be decided, the total must be more than $0, the subcontractor's bank details must be verified, and any red or amber solvency check must be acknowledged. Your payment readiness setting can add more checks.
  • Approval does not hold up serving the schedule on the subcontractor: Generate & Send stays available, so you can still meet your payment schedule deadline.
  • With a workflow set up, the Accept button is replaced by Submit for Approval, so every schedule is approved before it is accepted.

Example set-ups

PM approves, Accounts releases
Builders with a separate accounts team
  1. 1PM approve Fixed roleProject Team: Project Manager
  2. 2Finance release Fixed roleWorkspace role: AccountsIts approval accepts the schedule and sends the bill to Xero
Approve by value, then CA to send
Contract Admins who prepare schedules and send them out
  1. 1Approve scheduled amount DoA-drivenBy valueThe Contract Admin who submitted it cannot approve this step
  2. 2CA to send Fixed roleProject Team: Contract AdminSubmitter can act on this step ticked: the CA closes it, which accepts the schedule
Routed by value
Smaller builders
  1. 1Approve scheduled amount DoA-drivenBy value
Worksheet CYour set-up: Subcontract payment schedulesIn Deep Space: Subcontract Payment Schedule
Do you want this record type approved?Yes, set up a workflowNo / not usedDecide later
StepStep nameFixed role or DoA-drivenRole(s), and workspace or project TeamAll must approve?Min amount (Fixed role only)
1
2
3

17Company general inductions

Compliance and HSEQRouted by role (no amount)

A subcontractor company's general induction: the company-level form a business completes before it works for you (as opposed to each worker's site induction).

What it controls
Whether the company's general induction is accepted.
Where it starts
Automatically. When a subcontractor company submits its general induction, Deep Space starts the approval itself; nobody has to request it. Reviewers can approve or reject from My Approvals or from the company's Induction tab in the Subcontractor Directory.
Amount used for DoA
None. It is routed by role only.
When it is approved
The induction is marked Approved on the company's record, and the company's contact is told the outcome by email.
When it is rejected
The induction is marked Rejected, and the company's contact is emailed the reviewer's comments and asked to contact you about the changes needed. It does not appear in anyone's Returned to me list.
With no workflow set up
It goes to your workspace admins, because there is no project Project Manager to fall back to.
Good to know
  • It is not tied to a project, so project Team roles do not apply. Use workspace roles such as HSEQ Manager or Procurement.
  • Auto-approve never applies to company inductions.

Example set-ups

HSEQ reviews
Most builders
  1. 1Review induction Fixed roleWorkspace role: HSEQ Manager
Procurement, then HSEQ
Builders who check commercial details (insurances, licences) before safety
  1. 1Commercial check Fixed roleWorkspace role: Procurement
  2. 2Safety acceptance Fixed roleWorkspace role: HSEQ Manager
Whoever gets to it first
Small teams
  1. 1Review induction Fixed roleWorkspace roles: HSEQ Manager or ProcurementAny one of them can approve
Worksheet CYour set-up: Company general inductionsIn Deep Space: Company General Induction
Do you want this record type approved?Yes, set up a workflowNo / not usedDecide later
StepStep nameFixed role or DoA-drivenRole(s), and workspace or project TeamAll must approve?Min amount (Fixed role only)
1
2
3

18HSEQ records: SWMS, site inductions, permits to work and plant inductions

Compliance and HSEQRouted by role (no amount)

These four record types come from your HSEQ registers in Horizon, filled in by your team or by subcontractors and workers in DS Site. Each has its own workflow, and they behave the same way:

SWMS (safe work method statements)

A subcontractor's safe work method statement for high-risk work, reviewed before the work starts.

What it controls
Whether the SWMS is accepted for the project.
Where it starts
HSEQ › SWMS: open the SWMS and click Request Approval. Where SWMS sign-on is switched on for your company, a SWMS submitted in DS Site starts its approval automatically, as long as a SWMS workflow is set up.
Amount used for DoA
None. It is routed by role only.
When it is approved
The SWMS status becomes Approved. With SWMS sign-on switched on, its files go onto the company's SWMS sign-on form in DS Site, ready for workers to sign on.
When it is rejected
The SWMS status becomes Rejected. With SWMS sign-on switched on, its files come off the sign-on form.
With no workflow set up
Request Approval still works and goes to the project's Project Manager (or your workspace admins). SWMS submitted in DS Site do not start an approval on their own: that needs a SWMS workflow.
Site Manager approves
Most projects
  1. 1Site review Fixed roleProject Team: Site Manager
Site, then HSEQ
High-risk construction work
  1. 1Site review Fixed roleProject Team: Site Manager
  2. 2HSEQ approval Fixed roleProject Team: HSEQ Lead
Worksheet CYour set-up: SWMSIn Deep Space: SWMS
Do you want this record type approved?Yes, set up a workflowNo / not usedDecide later
StepStep nameFixed role or DoA-drivenRole(s), and workspace or project TeamAll must approve?Min amount (Fixed role only)
1
2

Site inductions

A worker's induction onto one of your projects.

What it controls
Whether the worker's site induction is accepted.
Where it starts
HSEQ › Site Inductions: open the induction and click Request Approval.
Amount used for DoA
None. It is routed by role only.
When it is approved
The induction shows the approval as Approved. Approve it from the induction itself (View Approval Route) and it is also marked Inducted.
When it is rejected
The induction shows the approval as Rejected.
With no workflow set up
Request Approval still works: it goes to the project's Project Manager, or your workspace admins if there is none.
Site Manager approves
Most projects
  1. 1Induction check Fixed roleProject Team: Site Manager
Site Manager or Site Engineer
Busy sites with several supervisors
  1. 1Induction check Fixed roleProject Team: Site Manager or Site EngineerAny one of them can approve
Worksheet CYour set-up: Site inductionsIn Deep Space: Site Induction
Do you want this record type approved?Yes, set up a workflowNo / not usedDecide later
StepStep nameFixed role or DoA-drivenRole(s), and workspace or project TeamAll must approve?Min amount (Fixed role only)
1
2

Permits to work

A permit for high-risk work such as hot works, confined space entry or work at height.

What it controls
Whether the permit is approved before the work starts.
Where it starts
HSEQ › Permits to Work: open the permit and click Request Approval.
Amount used for DoA
None. It is routed by role only.
When it is approved
The permit shows the approval as Approved.
When it is rejected
The permit shows the approval as Rejected.
With no workflow set up
Request Approval still works: it goes to the project's Project Manager, or your workspace admins if there is none.
Good to know
Permit issuer approves
Most projects
  1. 1Issue permit Fixed roleProject Team: Site Manager
Two signatures
Companies whose permit procedure needs site and safety sign-off
  1. 1Issue permit Fixed roleProject Team: Site Manager and HSEQ LeadRequire all approvers ticked: both must approve
Worksheet CYour set-up: Permits to workIn Deep Space: Permits to Work
Do you want this record type approved?Yes, set up a workflowNo / not usedDecide later
StepStep nameFixed role or DoA-drivenRole(s), and workspace or project TeamAll must approve?Min amount (Fixed role only)
1
2

Plant inductions

The acceptance of a piece of plant or equipment onto site (its pre-start induction).

What it controls
Whether the plant is accepted onto site.
Where it starts
HSEQ › Plant Inductions: open the plant induction and click Request Approval.
Amount used for DoA
None. It is routed by role only.
When it is approved
The plant induction shows the approval as Approved. Approve it from the plant induction itself and it is also marked Inducted.
When it is rejected
The plant induction shows the approval as Rejected.
With no workflow set up
Request Approval still works: it goes to the project's Project Manager, or your workspace admins if there is none.
Site Manager approves
Most projects
  1. 1Plant check Fixed roleProject Team: Site Manager
Site, then HSEQ for major plant
Sites with cranes or other major plant
  1. 1Plant check Fixed roleProject Team: Site Manager
  2. 2HSEQ acceptance Fixed roleProject Team: HSEQ Lead
Worksheet CYour set-up: Plant inductionsIn Deep Space: Plant Inductions
Do you want this record type approved?Yes, set up a workflowNo / not usedDecide later
StepStep nameFixed role or DoA-drivenRole(s), and workspace or project TeamAll must approve?Min amount (Fixed role only)
1
2

19Submittal sign-off

NoticesRouted by role (no amount)

Your internal sign-off of a submittal (for example shop drawings, samples or product data) that is marked as needing a signature.

What it controls
The internal sign-off a signature-required submittal needs before it can be closed.
Where it starts
Notices › Submittals: on a submittal that requires a signature, use the Sign-off panel to send it for approval. The panel reads "Required before this submittal can be closed".
Amount used for DoA
None. It is routed by role only.
When it is approved
The sign-off is recorded on the submittal, and it can be closed.
When it is rejected
The rejection is recorded on the submittal, which stays open.
With no workflow set up
This is how it works today, because submittals have no workflow of their own: sign-off goes to the project's Project Manager, or your workspace admins if there is none.
Good to know
  • There is no Submittal entry in the Entity type list yet, so you can't build a workflow for it on the Delegation of Authority page. Sign-off goes to the project's Project Manager, or to your workspace admins when the project has no Project Manager.
  • If your submittals need a different sign-off route, write it in the worksheet below and our support team will tell you what can be set up.
  • Auto-approve never applies to submittals.

Example set-ups

What happens today
Every workspace
  1. 1Sign-off Fixed roleProject Team: Project Manager (automatic)Workspace admins if the project has no Project Manager
Worksheet CYour set-up: Submittal sign-offIn Deep Space: Submittal sign-off
Do you want this record type approved?Yes, set up a workflowNo / not usedDecide later
StepStep nameFixed role or DoA-drivenRole(s), and workspace or project TeamAll must approve?Min amount (Fixed role only)
1
2

20A complete example

Here is one complete set-up for a fictional mid-sized builder, using the example limits from section 3. It shows how the pieces fit together; it is not a recommendation.

Settings and Highest Authority

Workflows

WorkflowSteps
PO1 · Fixed role: project Team › Contract Admin or Quantity Surveyor "Commercial check" → 2 · DoA-driven "Authority sign-off"
PO Invoice1 · Fixed role: Accounts "Accounts check" → 2 · DoA-driven "Approve for payment"
Subcontract Agreement1 · Fixed role: project Team › Contracts Manager "Contract check" → 2 · DoA-driven "Award sign-off"
Tender Recommendation1 · Fixed role: project Team › Lead Estimator "Estimating review" → 2 · DoA-driven "Award approval"
Head Contract (Client)1 · Fixed role: Commercial Manager "Contract review" → 2 · Fixed role: Managing Director "Execute"
HC Variation (Client)1 · DoA-driven "Approve variation price"
HC Progress Claim1 · Fixed role: Commercial Manager "Claim review"
Client Payment Schedule1 · Fixed role: Commercial Manager "Accept client's schedule"
Subcontract Variation1 · Fixed role: project Team › Project Manager "PM review" → 2 · Fixed role: Construction Manager "Senior review", Min amount $50,000
Subcontract Payment Schedule1 · Fixed role: project Team › Project Manager "PM approve" → 2 · Fixed role: Accounts "Finance release"
PS Drawdown1 · DoA-driven "Approve drawdown"
Company General Induction1 · Fixed role: HSEQ Manager "Review induction"
SWMS1 · Fixed role: project Team › Site Manager "Site review" → 2 · Fixed role: project Team › HSEQ Lead "HSEQ approval"
Site Induction, Plant Inductions, Permits to Work1 · Fixed role: project Team › Site Manager

With this set-up, a $42,000 purchase order is checked by the project's Contract Admin or Quantity Surveyor, then goes to the project's Project Manager (the lowest limit that covers $42,000). A $180,000 subcontract goes to the project's Contracts Manager for a contract check, then to the Construction Manager. A $640,000 subcontract goes to the Contracts Manager and then the General Manager. A $2.4m subcontract goes to the Contracts Manager and then the Managing Director as Highest Authority.

21Worksheet D: agree it and hand it over

When Worksheets A to C are agreed, record who signed it off. Then either set it up yourself or send it to our support team. Records already waiting for approval keep the route they started with; the new rules apply to records submitted after they are set up.

Worksheet DAgreed and ready to set up

We have agreed the roles, limits, Highest Authority, settings and workflows in Worksheets A to C.

NameRoleDate
Next stepWe will set it up ourselvesPlease set it up for us (send to help@deepspacegroup.ai)

22Setting it up: yourself, or with our support team

Set it up yourself

Follow Setting up DoA for your company in the DoA guide, in its order: roles in Admin › Security, then the Approval Thresholds (Worksheet B), the Highest Authority, one workflow per record type (Worksheet C), the two settings (Worksheet A), and project overrides last. Use the Threshold simulator in the workflow editor to check each workflow with a few test amounts before you save.

Or let our support team set it up

  1. Send us your worksheets
    Email help@deepspacegroup.ai with the subject DoA set-up and your company name. Attach the worksheets as PDF, the CSV download from this page, or your existing DoA policy if you already have one written down. Partly filled worksheets are fine: tell us what is still undecided.
  2. We check and configure it
    We check the roles exist in Admin › Security and have the right people in them, then set up your limits, Highest Authority, workflows, settings and any project overrides. If something in the worksheets is unclear or would not behave the way you expect, we ask before we build it.
  3. We test it with you
    We walk through a few test amounts with you in the Threshold simulator, and through a real record of each important type if you like, so you can see who gets each approval.
  4. You maintain it
    After that, it is yours to keep up to date as people and limits change. Changing a limit or a workflow step takes a minute, and we are always happy to help.
Keep it running smoothly
  • Set the Highest Authority early. It is the safety net for large amounts and stuck steps.
  • Make sure every role you use has people in it, and every project has its Team filled in. A step whose role is empty goes to Highest Authority with a warning.
  • When someone is away, add an out-of-office rule on the Delegations tab (DoA guide, section 11) rather than changing the workflow.
  • When someone leaves or changes job, update their role in Admin › Security or the project Team. Approvals follow the role automatically.

23Approvals that are not set up in DoA

A few approvals in Deep Space have their own process and are not configured on the Delegation of Authority page. They are listed here so nothing is missed when you plan.

ApprovalHow it worksWhere it is set up
TimesheetsA manager approves each worker's week, which locks it and posts the labour cost to the project. See Timesheets — Commercial User Guide.The Timesheets module
Subcontractor progress claimsNot a separate approval: you approve the payment schedule you issue in response, through the Subcontract Payment Schedule workflow.DoA (Subcontract Payment Schedule)
Your client's decisionsThe client approving a variation or certifying a claim is recorded on the record's own status. DoA only governs your internal sign-off before it goes to the client.The record itself (Head Contract registers)
Who can see and use each moduleThe Approve ticks on Admin › Security control access to pages, not who approves what or up to what value. That is always DoA.Admin › Security

24Common questions

Do we have to set up every workflow?
No. Set up the ones your policy needs. A record type without a workflow goes to the project's Project Manager (or your workspace admins), or is approved straight away if you turn on Skip approval when unconfigured.
Are the amounts ex GST or inc GST?
Ex GST, so set your limits ex GST. The one exception is a supplier invoice whose lines Deep Space could not read, which uses the invoice total as printed. For tender recommendations you type the award value in yourself: enter it ex GST, like the bids.
Can we import our DoA from a spreadsheet or from another system?
There is no self-service import. Send your worksheets, the CSV from this page or your existing DoA policy to help@deepspacegroup.ai and our support team will set it up for you. After that you maintain it on the Delegation of Authority page.
Can someone approve a record they raised themselves?
Only Subcontract Payment Schedules block it. On every other record type, if the person who raised a record holds the role a step goes to, they can approve that step, and that includes a DoA-driven step: a Project Manager's own $30,000 order goes to the Project Manager tier, which is them. If your policy needs a second person, start the workflow with a Fixed role step for someone who doesn't raise that kind of record (for example, a Contract Admin raises POs and the Project Manager approves them), and keep auto-approve off.
What happens to records already waiting when we change a workflow?
They keep the route they started with. Changes apply to records submitted afterwards.
Can one project have different rules?
Yes, with a project override of the workflow or of the limits (DoA guide, section 4). Use it sparingly: once a project has its own copy, later changes to the company default do not reach it.
We run more than one company in Deep Space. Do we do this twice?
Yes. Each workspace (one per legal entity) has its own DoA. Fill in a set of worksheets for each, or tell us that one entity should copy another and we will set both up.
An approver is away or has left. What now?
For planned leave, add an out-of-office rule on the Delegations tab. For a stuck step, a Highest Authority holder can approve on the approver's behalf with a comment. When someone leaves, update their role in Admin › Security or the project Team (DoA guide, section 11).